Kolkata Metro
Encardio-rite received the contract for the supply, installation & monitoring work for both UG-1 & UG-2 Packages that consisted of 10 km tunnel, 6 underground stations, 1 cut & cover and 1 cross over.
The scope of work broadly consisted of:
- Pre and post construction condition survey for buildings within zone of influence.
- Supply, installation of geotechnical and structural instruments used for safety monitoring.
- Manual and automatic monitoring.
- Programming and commissioning of automatic systems where required.
- Daily, weekly and monthly reporting with data evaluation & interpretation.
- Calibration of data loggers and sensors.
Instrumentation used included:
- Inclinometer system for diaphragm walls and subsurface monitoring around stations and tunnels.
- Inclinometer cum Magnetic extensometer for subsurface lateral movement as well as settlement monitoring.
- Piezometers (vibrating wire, casagrande and standpipe) for monitoring ground water level and pore pressures.
- Center hole load cell for anchors.
- Strain gauges for strut monitoring and for pile testing and diaphragm walls.
- Borehole extensometer for subsurface settlement and ground settlement points for surface settlement monitoring.
- Crack meters, tilt meters, bi-reflex targets, mini prism targets and building settlement points for structure monitoring.
- Portable readout units.
Package UG-1
Contractor: Afcons TTA JV (UG 1)
Consultants: General Consultants
The Line 1, also known as North-South Metro of the Kolkata Metro is a rapid transit system serving Kolkata, South 24 Parganas and North 24 Parganas in West Bengal. The line connects Dum Dum and New Garia and uses a 5 ft 6 in (1,676 mm) broad gage rolling stock.
Package UG-2
Contractor: ITD – ITD Cementation JV
Consultants: General Consultants
Line 2, also known as East-West corridor of the Kolkata Metro is a rapid transit system under construction, which will serve Kolkata, Salt Lake and Howrah in West Bengal underneath the Hoogly River. It will consist of 12 stations from Salt Lake Sector V in the east to Howrah Maidan in the west, of which 6 would be elevated and 6 would be underground, with a total distance of 14.67 km.